Who is responsible for scheduling inspections?

The Building Permit Applicant is responsible for calling to schedule inspections.

Show All Answers

1. Why is a permit required?
2. Why is there a fee to get a permit?
3. When is a permit required?
4. Who is responsible for scheduling inspections?
5. Who performs inspections?
6. How much notice is required for an inspection?
7. Are there any inspection fees?
8. What is a Certificate of Occupancy?
9. What if I do not agree with the inspection result?
10. Are alternate methods of construction permitted?
11. What do I do if I need a sewer or water inspection?
12. What do I do if I need an electrical inspection?